CONSTRUCTION INSPECTION, AND DRAW SCHEDULE
1ST INSPECTION
4TH INSPECTION
INSURANCE
BRICK & SIDING
7%
LOT CLEARED & FILLED
STUCCO
3%
SUB PLUMBING
SHEETROCK HUNG
3%
SUB ELECTRICAL
SHEETROCK FLOATED & TEXT.
3%
TERMITE TREATMENT
EXTERIOR PAINTED
2%
POST TENSION OR CONV.
SOPHISTS COMPLETED
2%
SLAB FORMED
INSPECTION
SPOT SURVEY
SLAB POURED
FOURTH DRAW
20%
INSPECTION
5TH INSPECTION
FIRST DRAW 
20%
INTERIOR PRIMED& PAINTED
3%
2ND INSPECTION
TRIM CARPENTRY
2%
PLUMBING COMPLETED
2%
FRAMING-WALLS
10%
ELECTRICAL COMPLETED
2%
FRAMING-ROOF
4%
A/C COMPLETED
2%
ROOF DECK AND FELTED
2%
CABINETS & COUNTERTOPS
3%
FIREPLACE
2%
APPLIANCES
2%
WINDOWS
2%
FLOOR COVERINGS
3%
INSPECTION
WALKS & DRIVES
1%
SITE CLEANED
SECOND DRAW 
20%
INSPECTION
3RD INSPECTION
FINAL DRAW
20%
PLUMBER ROUGH-IN
4%
COMMENTS:
A/C ROUGH-IN
4%
 
ELECTRICAL ROUGH-IN
4%
 
ROOF COMPLETE
4%
 
EXTERIOR DOORS
2%
 
INSULATION
2%
 
INSPECTION
 
 
THIRD DRAW 
20%
 
DRAW REQUEST
CONTRACT AMOUNT:
 
LAND DRAW:
 
AVAILABLE FOR CONST.:
 
DRAW AMOUNT
 
BALANCE:
 
 
 

 

 